The Critical Path

2026TV14Crime DramasMysteries
Susan works the case of a missing teenager who is presumed dead, whilst Luke has to get into the head of a killer who seems to have pulled off the perfect crime.
Play

Free with ads

Expand Details

Details

Susan works the case of a missing teenager who is presumed dead, whilst Luke has to get into the head of a killer who seems to have pulled off the perfect crime.

Genres: Crime DramasMysteries

Captions: English
Audio track: English (Original)